Saturday, 6 February 2010

36) Hazard


Penydarren Waterworks,
Merthyr.
Here we have a hazard which is an open trench that has nothing around it to prevent anyone falling into it. I have reported the hazard to the site manager.

35) Hazard


Penydarren Waterworks,
Merthyr.
Here we have a electric cable running across the site, which is a triping hazard.
I have reported the hazard to the site manager.

Thursday, 4 February 2010

34) Court Road Barry


This is a photo of where i have laid face brickwork to a line with other bricklayers.

33) Court Road Barry


Here we have a photo of were i have put installation on the wall and taped it up and also put clips on it.

32) Court Road Barry


Here is a photo of were i have run the blockwork to a line.

31) Court Road Barry


This is a sinlge block wall where i have racked it back ready to run it in to a line.